|
BDS Engineering,
Inc. (formerly Bement-Dainwood-Sturgeon) was retained to provide a topographic
survey and prepare improvement plans, specifications, cost estimates and
construction support services which included the following:
- Horizontal
control for the Training Complex consisting of 32 buildings.
- Approximately
3 miles of concrete streets (designed for tank loads).
- Curb,
gutter and sidewalks.
- Storm
drainage of over 2,200 feet of pipes and associated catch basins.
- Improvement
and erosion control of Las Pulgas Creek (Total drainage basin is over
3,800 acres).
|